CONFIDENTIAL Hyperscaler
Location: Santa Clara, CA
Client: Confidential
Role: General Contractor
Project Value: $4.5M
Size: 6MW
The CA22 building represents the second major expansion of a confidential client’s growing data center campus in Santa Clara. Planned for three total buildings and up to 74 MW of critical IT load, the campus continues to support some of the most demanding enterprise workloads in the region.
Constructiv served as both the technology designer and engineer of record (EOR) as well as the general contractor for a 6 MW client fit-out on the fourth floor of the CA22 building.
Preconstruction Services
Constructiv led all pre-construction activities, including:
Full project management
Design development
Electrical and structural engineering
Permitting coordination
Critical path method (CPM) scheduling
Establishment of the guaranteed maximum price (GMP)
Construction Execution
Following client approval, Constructiv executed the general contracting phase, which included:
Installation of electrical distribution from facility PDUs to busway and rack
Horizontal cable/fiber support (ladder rack) installation
Deployment of hot aisle containment systems
Procurement and installation of “middle of row” (MOR) racks
Structured fiber cabling
Security rough-in, device installation, and system activation
Seismic anchoring of all critical systems
Results
Constructiv delivered the project on time, under the self-developed GMP, and with zero punch-list items. The successful delivery of this 6 MW data hall further reinforces Constructiv’s reputation for precision, accountability, and technical excellence on high-performance data center projects.